High-resistance floating modules. Ready to install, built to last. 

Since 2000 we design, build and assemble floating solutions for mining, public sector, industry, recreation and docks. Latin American pioneers, 26 years on the water without corrosion or maintenance.

0

Years on the water

0

Countries

0

Compression resistance

0

Recyclable material

Solutions

Our solutions

Product · Assembly

Floating modular system

Eight steps to assemble the Ready Dock modules, inner union first, then outer. No welding or special tools required.

01 Phase

Inner union

Steps 1–4
STEP01

Join & insert

Modules are joined and the nut and inner connector are inserted.

STEP02

Modules linked

Modules joined together, with the nut and inner connector in place.

STEP03

Screw in

The inner connector is screwed in to lock the joint.

STEP04

Inner tightening

The key is inserted into the inner connector holes for tightening.

02 Phase

Outer union

Steps 5–8
STEP05

Join at the handles

Modules are joined through the handles and the outer bolt is inserted.

STEP06

Place the nut

The outer nut is placed onto the bolt.

STEP07

Outer tightening

The outer nut is tightened with the key.

STEP08

Assembly complete

Modules joined on the outside. Structure ready.

High-density polyethylene · Compression up to 9,100 kg/m² (Dictuc) · 100% recyclable

Why ReadyDock

Why choose us?

26 years on the water

Pioneers in Latin America since the year 2000.

In-house engineering

Our own engineers design every project to spec.

Proven strength

Up to 9,100 kg/m² compression (Dictuc: 2,198 kg per module).

Backed by Wenco S.A.

The largest polyethylene plant in Latin America.

Maintenance-free

High corrosion-resistance materials.

International coverage

Distributors in Chile, Mexico, El Salvador, Panama and Argentina; exports to Nicaragua and Peru.

Case studies

Projects

See all projects

Trusted by

  • Codelco
  • Anglo American
  • Minera Escondida
  • El Teniente
  • Minera Zaldívar
  • Sierra Gorda
  • Minera Collahuasi
  • Ministerio de Obras Públicas
  • Codelco
  • Anglo American
  • Minera Escondida
  • El Teniente
  • Minera Zaldívar
  • Sierra Gorda
  • Minera Collahuasi
  • Ministerio de Obras Públicas
Certificación ISO/FSSC 22000Garantía: 20 años uso recreacional · 3 años uso industrial

Have a project on the water?

Our engineers design, build and assemble it to spec.

Get a quote →